Thomas Keller 65aa830c87 If a project never saved specific tab access rights so far, the specific
access rights setting is not existant and therefor the projects' activity
calculation is always skipped. This should actually not happen.
2011-12-24 03:03:07 +01:00
2011-10-31 00:46:12 +01:00
Description
No description provided
2.9 MiB
Languages
PHP 82%
HTML 14.8%
CSS 1.4%
JavaScript 0.5%
Lua 0.4%
Other 0.9%